Bomu Oilfield Nigeria, Shell Nigeria
Bomu Manifold is located within the Bomu Oilfield in Rivers State, Nigeria. A number of spills occurred directly from the Trans Niger Pipeline (TNP) in the area between 1994 and 2009. The incidents devastated an area approximately 2.6Ha. Fiton used its in situ approach to remediate virtually all contaminants in less than 1 year.
Hilton Hotel Site Remediation, Government of Barbados
The Fiton Process was used to remediate contamination on the proposed site of the Hilton Hotel in Barbados. The process reduced contamination to levels considerably lower than government standard over a two and a half week period, allowing for construction of the current Hilton Hotel.
Sherman Mines Tamagami Ontario, DOFASCO
Remediated effluent and soil contaminated with oil and grease achieving levels substantially below government guidelines in faster than alternative approaches.
Industrial Site Rezoning, Ontario Ministry of the Environment and Toronto and Region Conservation Authority
The Fiton process was used to remediate approximately 7000 cubic meters of contaminated soil in a 12.5 hectare parcel of land adjacent to the Don River in Toronto, Ontario, Canada. The site was contaminated with a variety of industrial chemicals including PAH’s, PCP, and petroleum compounds including benzene, toluene, ethyl benzene, and zylenes. As a result of Fiton's success the land classification was changed from industrial to park land.
United Kingdom and Marine Scotland Trials, The Scottish Government
The U.K. Government conducted extensive trials over a three year period using Micro Fiton. As a result both the U.K and Scottish governments approved Micro-Fiton as a Bioremediation Agent within the United Kingdom controlled waters for the purpose of treating oil on the surface of the sea under the provisions of the Food and Environment Protection Act.